Russia Pilot Line Production Line+ Dry Room Project

This is Gelon's third battery production line in Russia-at 2021,June to sign the contract and prepare equipment for Moscow customer.

2022. June, Gelon engineers installed and commissioned equipment on-site, cooperated with local engineers to complete the installation and commissioning work successfully.

涛哥1299(1).jpg


Leave a Comment